[bsa_pro_ad_space id=1]

      The world leading magazine of heavy lifting and transport equipment for construction, energy, maritime and industry

Cometto SPMTs facing another challenge

Cometto SPMT self-propelled modular transporters have been used to complete a task for the German company Schares which is currently working on a project at the Th. Winkels in Kleve. The site conditions at the specialist for container and equipment manufacturing only allows the use of a narrow transport vehicle. Thanks to their 2.43 metre width, the self-propelled modular transporters from Cometto have been chosen. 

The task is to move three differently sized steel columns in a 2-file job from the production hall to the outdoor storage area. The smallest column weighs 40 tonnes and is 12 metres long. The middle column has a length of 26 metres and a weight of 80 tonnes. The heaviest element weighs 100 tonnes and is 12 metres long. For the small and the largest column, a 6-axle MSPE bogie with a 202 kW Power Pack Unit was used. For the medium and significantly longer steel element, the Schares team added another 6-axle MSPE bogie to provide the appropriate load support points. 

Joe Schönfeld, the driver of the combination, reports: ”Once again impressive how easily and precisely these transport masses can be positioned.” And his colleague Dominik Stoßberg adds: “I am also thrilled with the compact radio remote control, which weighs only three kilograms. Even after a long working day, it doesn’t become a burden for me.” 

Share This Post:

Congratulation!

JUST, MOVIN*

Sign in and get access to Move It Magazine latest issue for free. 

Or, register

Register to move it magazine and get one year access to the digital magazine subscription for free, 
newsletter, discount, events invitation and exclusives contents.