[bsa_pro_ad_space id=1]

      The world leading magazine of heavy lifting and transport equipment for construction, energy, maritime and industry

ALE installs new turbine and generator at a power plant in Egypt

ALE has recently completed the swift installation of a turbine and generator at the Supercritical Power Plant in Assiut, Egypt. To install the steam turbine, weighing 240t and measuring 8m long, ALE used a gantry and 200t capacity strand jacks to lift the turbine 16m from the ground. As the entrance to the building was perpendicular to the installation location, the turbine needed to be turned by 90°. This was performed using skidding beams and the gantry was then skidded over the installation location, where the turbine was lowered into position on its bench. These manoeuvres were repeated for the installation of the stator generator, weighing 296t and measuring 10m long.

This operation was completed as part of a series of upgrades at the power plant that will help to contribute to Egypt’s drive for sustainable urban development and economic growth.

Share This Post:

Congratulation!

JUST, MOVIN*

Sign in and get access to Move It Magazine latest issue for free. 

Or, register

Register to move it magazine and get one year access to the digital magazine subscription for free, 
newsletter, discount, events invitation and exclusives contents.