[bsa_pro_ad_space id=1]

      The world leading magazine of heavy lifting and transport equipment for construction, energy, maritime and industry

Sarens lifts a 250t trawler in the UK

In the British port of Whitby, the Sarens crew was asked to for launch the new Guiding Light trawler. This 26m long, 8m wide and 12m high boat weighing more than 250t required the use of a Demag TC2800-1 lattice boom mobile crane.
Indeed, the narrow limits of the site required the use of a powerful machine, stable and with a small footprint. The TC2800-1 was equipped with a 42 m main boom, a 30 m superlift back mast and a 200 t superlift counterweight.

Once the official launch ceremony was completed, the TC2800-1 lifted the entire mass of the trawler with its 200T superlift counterweight. The load was then slowly and precisely slewed anti-clockwise until it was directly above the water. The trawler was slowly lowered into the water, releasing the weight from the crane and completing a safe and successful lift.

Share This Post:

Congratulation!

JUST, MOVIN*

Sign in and get access to Move It Magazine latest issue for free. 

Or, register

Register to move it magazine and get one year access to the digital magazine subscription for free, 
newsletter, discount, events invitation and exclusives contents.