[bsa_pro_ad_space id=1]

      The world leading magazine of heavy lifting and transport equipment for construction, energy, maritime and industry

Gaussin : the 38t APM goes through the test, ongoing development for the 75t APM

After being tested extensively last summer in the Bolloré Ports of Pointe Noire terminal (Congo), the Gaussin group reported the conclusions of the 38t APM. Operational Expenditure (cost of energy, maintenance, files and workforce) compared to an equivalent diesel model gives very positive results, in terms of both power consumption, maintenance, autonomy (9 hours per 60 kWh pack), battery life as well as available rate. The overall assessment of the testing team of Bolloré Ports, based on 14 standards (comfort, accessibility, …), resulted with a score of 4,58 out of 5.

In the same time, Gaussin will achieve with Bolloré Ports the co-development of the 75t APM HE from the end of 2018. This new model will be available for sale from the beginning of 2019.

Share This Post:

Congratulation!

JUST, MOVIN*

Sign in and get access to Move It Magazine latest issue for free. 

Or, register

Register to move it magazine and get one year access to the digital magazine subscription for free, 
newsletter, discount, events invitation and exclusives contents.